Browse
Entries by tag
baseline 1blind 4capacity 1dataset 1decoy 1drilling 4full 1greedy 7groq 1large-instance 1llm 4meta 1method 1milp 6minelib 1minimum-mining 3models 1newman1 1ollama 1partial 5planning 1prompts 3scaling 1shaft 1simulator 4waste-cover 1
baseline
blind
capacity
dataset
decoy
drilling
full
greedy
- Simulator + LLM. Does the shaft help, and why the LLM loses track
- Simulator + LLM. The value fix and five models
- Simulator + LLM. Baseline and first prompt changes
- Scaling up. Five 1,000-block mines
- A first look at a real mine, and a surface that misleads
- When does exploratory drilling pay off?
- Starting the log, and where the project stands
groq
large-instance
llm
meta
method
milp
- Simulator + LLM. Does the shaft help, and why the LLM loses track
- Scaling up. Five 1,000-block mines
- A first look at a real mine, and a surface that misleads
- How the blind scheduler plans, and what planning one period at a time showed
- When does exploratory drilling pay off?
- Starting the log, and where the project stands